πŸ”₯ Hot IssueVerified

Unitree G3 vs Boston Dynamics Spot β€” 6-Month Field Comparison

F
FieldRobotics
2 days ago

Deployed both Unitree G3 and Spot at a construction site for 6 months. G3 advantages: price ($12K vs $75K), speed (5.5m/s vs 1.6m/s), open SDK. Spot advantages: stability on rough terrain, payload (14kg vs 8kg), maturity of ecosystem. For budget-conscious projects, G3 is 80% of Spot at 16% of the price. For mission-critical industrial use, Spot still wins.

Real-world 6-month comparison of Unitree G3 and Boston Dynamics Spot on construction sites.

G3 Price
$12,000
Spot Price
$75,000
Test Duration
6 months
Winner
Depends on budget
#Unitree#Spot#Quadruped#Comparison#Field Test
3 λŒ“κΈ€

λŒ“κΈ€ 3개

0/500
μ—”
μ—”μ§€λ‹ˆμ–΄A2μ‹œκ°„ μ „

정말 μœ μš©ν•œ μ •λ³΄λ„€μš”! 저도 λΉ„μŠ·ν•œ 문제λ₯Ό κ²ͺκ³  μžˆμ—ˆλŠ”λ° λ§Žμ€ 도움이 λ˜μ—ˆμŠ΅λ‹ˆλ‹€.

읡
읡λͺ…1235μ‹œκ°„ μ „

ν˜Ήμ‹œ μ½”λ“œ 곡유 κ°€λŠ₯ν•˜μ‹ κ°€μš”? 저도 μ‹œλ„ν•΄λ³΄κ³  μ‹ΆμŠ΅λ‹ˆλ‹€.

R
RobotDev1일 μ „

이 λ°©λ²•μœΌλ‘œ ν•΄κ²°ν–ˆμŠ΅λ‹ˆλ‹€. κ°μ‚¬ν•©λ‹ˆλ‹€!